Navajo County Courthouse

Navajo County Courthouse
Navajo County CourthouseNavajo County Courthouse
At-a-glance:
Project location: Holbrook AZ
Date completed: 2012

The RAR Architects team field-measured, documented and structurally analyzed the historic Courthouse in Holbrook AZ – the client was concerned with settling floors and significant cracking in key walls. Among other items, they requested analysis of the vibrations caused by the nearby railway track.


Fort Tuthill Amphitheater

Roof over the amphitheater stage
Roof over the amphitheater stageRoof over the amphitheater stage Concession stand & entry gateConcession stand & entry gate
At-a-glance:
Project location: Flagstaff, AZ
Size: 28 acres
Date completed: 2006

• 2100 General Admission lawn seats

• 650 covered orchestra seats

• 6-10 serviced vendor spaces, 15-20 non-serviced vendor spaces

• Restroom, first-aid and concession facilities

• 60’x40′ covered outdoor stage with full A/V capabilities


Pepsi Amphitheater (formerly Pine Mountain Amphitheater) at Fort Tuthill Fairgrounds was an entire master-planned performance venue designed around a pre-existing stage at the fairgrounds.


The slope lent itself to a natural amphitheater, so RAR was able to design an outdoor stage roof and backdrop/performer’s prep rooms around the existing stage, and re-grade the site to allow for a path back up the hill to the concession/first-aid/restroom facility we designed as the entry element for all the venue amenities.


The amphitheater enjoys heavy use by a number of professional musicians every year.


Doney Park Fire Station (now Summit Station #32)

Summit Fire District headquarters
Summit Fire District headquartersSummit Fire District headquarters
At-a-glance:
Project location: Flagstaff, AZ
Size: 7,800 square feet
Date completed: 1997

Fire station and community meeting room for Summit Fire District


Hopi Tribal Courtroom

(Sorry, no pictures for this project were found)
At-a-glance:
Project location: Keams Canyon, AZ
Size: 1,602 S.F.
Date completed: 2010

Remodeling an existing administrative building to provide a new court room, I.T. space, secure entry and judges’ chamber.


Aspey Watkins & Diesel

Completed AWD building
Completed AWD buildingCompleted AWD building
At-a-glance:
Project location: Flagstaff, AZ
Size: 41,000 square feet
Date completed: 2002

Four story office building. Combines restored three-story strcture with new four-story lobby element.


Completed project includes underground parking for 27 automobiles.


Animas Valley Elementary School

Entrance to the school
Entrance to the schoolEntrance to the school
At-a-glance:
Project location: Colorado
Size: 44,000 square feet
Date completed: 1996

• 44,000 sf elementary school

• $2,200,000 budget

• 850 students

• Design/Bid/Build project


A co-design Design/Bid/Build project, together with R. Michael Bell, this was a new school facility in the rural Animas Valley area near Durango.


It was a single-story masonry building design with a wood-frame roof system and a metal roof.


As a K-6 elementary school, it provides classrooms for 850 students, together with assocated administrative space, cafeteria, administrative space, and open recreation areas.


The project budget was $2,200,000, with only one no-cost change order.


Construction time was 9 months.


Sechrist Dorm

Entrance
EntranceEntrance View from the streetView from the street
At-a-glance:
Project location: Flagstaff, AZ
Size: 4,000 square feet
Date completed: 1998

Addition of a new student activity room, classroom space and offices at the existing Sechrist Dormitory on the campus of Northern Arizona University


Flagstaff and Page Accommodation Schools

Typical exterior near the end of construction
Typical exterior near the end of constructionTypical exterior near the end of construction
At-a-glance:
Project location: Flagstaff and Page, AZ
Size: 2004
Date completed: 1999

New 17,000sf accommodation high schools for Coconino County Accommodation School District.


New buildings of masonry and metal frames with metal roofs, the interior spaces were designed to be flexible enough to provide space for many functions, from High School classes to day care facilities.


Summit Fire District Station #31

Summit Fire District Station #31 nearing completion
Summit Fire District Station #31 nearing completionSummit Fire District Station #31 nearing completion
At-a-glance:
Project location: Flagstaff, AZ
Size: 8595 S.F.
Date completed: 2005

New fire station at Townsend-Winona and Cosnino Rd in Flagstaff. Also includes a community center area.


Summit Maintenance Building

Dramatic backdrop overlooking the Summit Fire District Maintenance Facility
Dramatic backdrop overlooking the Summit Fire District Maintenance FacilityDramatic backdrop overlooking the Summit Fire District Maintenance Facility Interior of the Maintenance BayInterior of the Maintenance Bay
At-a-glance:
Project location: Flagstaff, AZ
Size: 6,240 square feet
Date completed: 2011

A new maintenance bay at an existing fire station