• 44,000 sf elementary school
• $2,200,000 budget
• 850 students
• Design/Bid/Build project
A co-design Design/Bid/Build project, together with R. Michael Bell, this was a new school facility in the rural Animas Valley area near Durango.
It was a single-story masonry building design with a wood-frame roof system and a metal roof.
As a K-6 elementary school, it provides classrooms for 850 students, together with assocated administrative space, cafeteria, administrative space, and open recreation areas.
The project budget was $2,200,000, with only one no-cost change order.
Construction time was 9 months.